濮陽翻譯公司關(guān)鍵字:This is the whole machine integrity issues, the major responsibility of the main manufacturers - Shanghai Airlines commitment.This is necessary to establish a "supplier management項目標(biāo)書翻譯 外文標(biāo)書翻譯system." Its task is the product翻譯招投標(biāo)書費用和報價ion of plant product翻譯招投標(biāo)書費用和報價ion, technology, quality, coordination and control. This ad hoc management項目標(biāo)書翻譯, and establishing procedures for supplier management項目標(biāo)書翻譯, purchase order issued by the state table and the corresponding process, the supplier quality 外文標(biāo)書翻譯system assessment, and to the quality of the plant to send representatives.The 外文標(biāo)書翻譯system is fully provided by us. Because McDonnell Douglas product翻譯招投標(biāo)書費用和報價ion arrangements with our different understanding of the contract the two sides have inconsistencies. A part, we believe it should do it, it think you should do these things if the assembly passing the buck when it found that the preparation of process documents on trouble. Assembly test process documents (AO) provided by the United States. According to the United States to provide information on the aircraft, prepared and issued 50,000 documents a number of technology, and coordination of the whole machine of the process line, coordination of programs, with the other three brothers jointly determine the division of plant interface.Components to establish a hierarchical database (IBOM). This is the division of labor, payment of drawings, material supply, quality control process based on the dynamic progress, so the whole machine is to ensure the integrity of the technical prerequisites. IBOM is a dynamic database, once the project changed as the content had time to change.Verification of the integrity of the whole machine. Start of the project, McDonnell Douglas Model airworthiness certification just completed work, not by the configuration of the integrity of china最大的翻譯標(biāo)書公司或機構(gòu)是哪家? set up the database, so the information provided by the United States started a lot of errors, not all or even drawings. Airlines organized a special team, through the computer all the brothers and plant information exchange in Shanghai, according to technology and engineering databases one by one database verification, coordination, revision, approval, and then enter the information base. The first single frame in accordance with Parts (SSPL) coordination, the U.S. and our preparation of process documents, a difference of 3000 a number of parts. Verified by cross-checking with the U.S., the final agreement. This involves all aspects of the relationship, the workload is very large.Leader of the flight, FAA also believes that the integrity of the whole machine is the key. They plant several times to check on the fly, to seize hold of this thing. "Just pick a figure out of the part number, asked on the spot to answer, this is the outline of which of the assembly, which process the file upload, and change is what the letter, with no missing equipment? We'll give him a check from the computer out in his do not worry, look at the written process documents, and we brought him to the scene to see. This really relieved, sometimes dozens of them a row of parts of the drawing number, call you on the spot out of this thing. This Our management項目標(biāo)書翻譯 is a very big promotion. "
|