標(biāo)書翻譯 ?工程項(xiàng)目總承包管理(三)

 

7.4.3與設(shè)計(jì)等協(xié)作單位的合作關(guān)系
總承包按合同、設(shè)計(jì)圖紙及規(guī)范要求,在監(jiān)理的監(jiān)督下,將設(shè)計(jì)藍(lán)圖轉(zhuǎn)化為實(shí)物工程??偝邪夹g(shù)管理部負(fù)責(zé)協(xié)調(diào)、處理與設(shè)計(jì)單位的各項(xiàng)工作關(guān)系:
一、施工前總承包組織相關(guān)技術(shù)人員對施工圖紙進(jìn)行詳細(xì)的會審,提出圖紙中存在的問題;由設(shè)計(jì)單位對總承包及分包單位進(jìn)行設(shè)計(jì)交底,解答圖紙中的疑問,接受總承包的修改建議和意見。
二、總承包根據(jù)施工總進(jìn)度計(jì)劃向設(shè)計(jì)單位提出施工圖需求計(jì)劃,設(shè)計(jì)單位盡最大可能滿足總承包的要求,保證工程進(jìn)度。
三、總承包對工程實(shí)施中出現(xiàn)的與設(shè)計(jì)相關(guān)的問題,及時向設(shè)計(jì)單位進(jìn)行匯報,征求設(shè)計(jì)意見;及時向設(shè)計(jì)單位提供各專業(yè)設(shè)計(jì)上存在的或可能存在矛盾的情況匯報,協(xié)助設(shè)計(jì)單位解決各專業(yè)設(shè)計(jì)中存在的沖突,滿足工程實(shí)用需要。
四、總承包嚴(yán)格審核各種加工圖、安裝節(jié)點(diǎn)圖、專業(yè)深化設(shè)計(jì)、二次設(shè)計(jì)等,并報送設(shè)計(jì)單位批準(zhǔn)。設(shè)計(jì)單位協(xié)助、指導(dǎo)總承包及各專業(yè)分包單位深化設(shè)計(jì)和詳圖設(shè)計(jì)工作,貫徹設(shè)計(jì)意圖,保證設(shè)計(jì)圖紙的質(zhì)量。
五、嚴(yán)格執(zhí)行設(shè)計(jì)圖紙要求、按圖施工,無設(shè)計(jì)變更或工程洽商,任何人無權(quán)改動施工圖紙,未經(jīng)設(shè)計(jì)單位批準(zhǔn)的圖紙不得使用。
六、在與設(shè)計(jì)單位的合作中,在開工前制定設(shè)計(jì)變更處理工作程序,遇有設(shè)計(jì)變更發(fā)生時,及時迅速地履行程序,并協(xié)調(diào)好各方面的工作。
7.4.4與政府主管部門之間的關(guān)系協(xié)調(diào)
一、及時辦理各種工程手續(xù)。
二、積極與政府主管部門進(jìn)行溝通,及時通報工程的各項(xiàng)進(jìn)展情況,征得其對本工程建設(shè)的支持和幫助,保證大環(huán)境有利于工程建設(shè)。
? 三、自覺接受政府的監(jiān)督和指導(dǎo),依法建設(shè)。
四、主動與公安交通部門取得聯(lián)系,得到施工占用道路的批準(zhǔn)和運(yùn)輸?shù)臅惩ā?br /> 五、主動與市容監(jiān)察部門聯(lián)系,搞好施工現(xiàn)場周圍地區(qū)的環(huán)境衛(wèi)生和環(huán)境保護(hù)。
六、主動與市建委、質(zhì)監(jiān)站聯(lián)系,取得他們對于工程質(zhì)量和施工安全的指導(dǎo)與認(rèn)可。
7.4.5處理好與周邊社區(qū)的關(guān)系
一、加強(qiáng)與周邊社區(qū)、單位的聯(lián)系溝通,及時向其通報工程情況,宣傳工程建設(shè)的意義,對給其造成的不便征得諒解,減少或避免相互間的矛盾。對周邊社區(qū)居民、單位提出的問題,要合理解釋和盡量予以滿足和解決。
二、對受施工的噪聲、強(qiáng)光、灰塵影響的單位和居民采取必要的彌補(bǔ)措施。同時也積極采取預(yù)防措施減少這些危害,盡可能地保護(hù)周圍單位和居民的利益。
7.5與各專業(yè)分包單位的配合
? 與各專業(yè)分包單位的配合內(nèi)容如下:
一、塔吊等垂直運(yùn)輸機(jī)械的協(xié)調(diào)配合
總承包向?qū)I(yè)分包單位提供現(xiàn)場已有的塔吊、升降設(shè)備、垂直運(yùn)輸機(jī)械等。各專業(yè)分包應(yīng)每周以書面形式向總承包提出運(yùn)輸申請,總承包調(diào)配安排塔吊和其他提升設(shè)備進(jìn)行運(yùn)輸。
二、施工腳手架的協(xié)調(diào)配合
專業(yè)分包按照總承包的管理規(guī)定規(guī)范的使用腳手架。需要總承包專門搭設(shè)腳手架的,應(yīng)提前提出書面申請,由總承包予以安排。
三、施工場地協(xié)調(diào)管理
施工場地管理實(shí)行動態(tài)管理。專業(yè)分包單位進(jìn)場施工前,應(yīng)向總包提交其施工材料及設(shè)備堆放、加工廠、辦公、居住所需場地面積,總承包根據(jù)施工現(xiàn)場總體布置和現(xiàn)場實(shí)際情況,合理安排場地,并劃分責(zé)任區(qū)。臨建設(shè)施由總承包統(tǒng)一規(guī)劃,統(tǒng)一布置,統(tǒng)一建設(shè)。標(biāo)書翻譯
四、 施工用水、用電
總包在施工期間在現(xiàn)場周圍布置若干供水接口,以便于專業(yè)分包單位用水方便。專業(yè)分包施工前提出施工用電計(jì)劃,總承包審核后提供用電接口位置、數(shù)量,以確保其用電方便。在設(shè)備測試、調(diào)試、試運(yùn)轉(zhuǎn)期間,總承包按照專業(yè)分包提出的要求,提供其所需的水壓、電壓及容量要求,保證相應(yīng)專業(yè)測試、調(diào)試及試運(yùn)轉(zhuǎn)正常進(jìn)行。
五、垃圾清理
專業(yè)分包應(yīng)做好作業(yè)面的垃圾清理工作,做到工完料盡場地清。廢棄物與垃圾的處理按總包的要求集中到指定地點(diǎn),由總承包統(tǒng)一處理。
7.4.3 Cooperation Relationship with Relevant units as Designing Unit, etc.,
The general contractor should turn the designing blueprint into real construction according to contract, designing drawings and regulations while under the supervising of supervisor. The technical management department of general contractor should be responsible for coordinating and handling working issues of all kinds with designing unit as follows:
1.The general contractor organize relevant technicians to do joint checkup of drawings and raise problems existing in drawings; then the designing unit introduces designing conditions to general contractor and subcontracting units, answer their questions about drawing , accept the modifying opinions of general constrictor.
2. The general contractor should give designing unit the construction drawing requirements according to the general construction programming. And the designing unit should try its best to meet the requirements, in order to guarantee the construction programming.
3. For the problems relating to designing occur during the constructing process, the general constrictor should report these problems to designing unit in time and seek the designing opinions; also the general contractor should report to the designing unit on all the possible conditions or problems existing in professional design, assist the design unit to solve all the contradiction in professional design for meeting the practical needs in constructing.
4. The general contractor should strictly examine all the operation drawing, installation nodes drawing, professional deepening design, secondary design, etc, and submit these drawings to designing unit fro approval. The designing unit should assist and help the general contractor and all professional subcontracting units to deepen the design and make detail design, to completely carry out the designing intention and guarantee the quality of design drawings.
5. Strictly carry out the requirements of design drawings and construction according to these drawings. No one has the right to modify the constructing drawings without design alteration or constructing negotiations. The drawings without the approval of designing unit are prohibited to use.
6. Draw up the processing procedures for design alteration before construction during the cooperation with designing unit. If any design alterations happen, carry out the processing procedures quickly and coordinate works of every aspect well.
7.4.4 Coordinate the Relationship with the Governmental Authorities
1. Transact all kinds of the formalities about the project in time.
2. Communicate with the governmental authorities positively,brief the progress of the work in time, to obtain support and help of this construction? and make sure big environment benefit construction works.
? 3. Accept the supervision and instruction of government conscientiously and construct according to the law.
4. Connect with public security and transportation departments to get approval of on-road situation during construction and ensure smooth transportation.
5. Connect with municipal appearance supervision departments actively, clean up and protect construction site and surrounding areas.
6. Connect with city construction official and Administration of Quality Supervision of Municipality to get their instruction and approval of construction quality and safety.
7.4.5 Get on well with Surrounding Communities
1. Increase connection and communication with surrounding communities and companies. Brief the progress of the work to them in time and advocate the significance of construction works so as to get understanding and lessen or avoid contradiction. Explain the questions, try best to meet the requirements and solve the problem raised by residents of surrounding communities and companies.
2. Take essential compensation measures to the companies and residents that influenced by construction noise, high light and dust.
7.5 ?Cooperate with all the Subcontractors of Special Fields
The following are content of cooperation with all special subcontractors:
1. Coordination and Cooperation of Tower Crane and other Vertical Transportations
General contractor provides special subcontractors with tower crane, lifting appliance and vertical transportations which are already at the site. All special subcontractors should present transportation request toward general contractor in written form weekly. General contractor allocates and arranges tower crane and other lifting appliances to transport.
2. Coordination and Cooperation of Construction Scaffold
Special subcontractors use scaffold according to rules of general contractor. A written application is required when general contractor is needed to erect scaffold, so as to offer arrange.
3. Coordination Management of Construction site
Dynamic management is applied to coordination management of construction site. Special subcontractors should submit requested site area, including construction material, equipment, processing factory, office and living, to general contractor before their approach. General contractor bases on general layout and real condition on construction site, reasonably offers places and divides response districts. General contractor is responsible for unified planning, unified decorating and unified construction of temporary build.
4. Construction Water and Power
General contractor fixes several water connectors at the site surroundings during construction period, which is convenient for special subcontractors to use water. Special subcontractors propose construction power plan before construction. After auditing, general contractor provides power joint position and amount to ensure they use power conveniently. During the period of equipment testing, debugging and commissioning, general contractor follows require of special subcontractors and meet their requirements of water pressure, voltage and capacity, in order to guarantee relevant special testing, debugging and commissioning to operate normally.
5. Construction Debris Cleaning
Special subcontractors should clean up debris on the operation side. When the works is completed,materials should be used up and the side is clean. On request of general contractor, waste and debris is disposed to designated location, and handled uniformly by general contractor.